↓ Skip to main content

·53 words

I use a graph based note taking tool (foam) and I am to yet derive any kind of value from the graph (other than some minor visual oohs and aahs). It’s vastly oversold and I don’t want to think about all the time people have wasted tidying and linking up their notes.

https://www.otherlife.co/pkm/

Alper Cugun
Author
Alper Cugun

Related

·13 words
Twitter will keep working in the same sense that people can use Jira.

·42 words
As a company scales, there are phase shifts which feel like they suck all the productivity out of an organization. The way to get through as described here is familiar: categorize and capture everything, reduce WIP and loop through your process.

·52 words
A lot to like in this article (“They avoid scrum and SAFe like the plague.”) but I’ll settle for adopting the core thrust of it and just retiring the entire concept of a PO and never have to debate “What is the difference between a PM and a PO?” ever again.